All tools
Oilfield Pipe Displacement Calculator
Compare open-ended metal displacement and closed-end displacement from tubular OD, ID, and length.
Use as a preliminary reference
Preliminary reference only. Verify inputs, results, equipment data, and operational decisions with a qualified engineer and the applicable current procedures.
Method
Metal displacement = (OD² - ID²) / 1029.4 bbl/ft. Closed-end displacement = OD² / 1029.4 bbl/ft.
Example: enter OD, ID and length from the current tubular data sheet to compare both reference cases.