Keep buyer-supplied files separate from documents requested with the quotation. If a detail is unavailable, mark it as requiring confirmation and identify the affected item.
- Equipment and quantity
- Assign one BOQ item number per configuration. State the equipment or part name, quantity and unit: pieces, sets or complete assemblies. List accessories and spares separately.
- Technical scope and interfaces
- Record the model, size, pressure or load rating, materials, operating conditions and connections as applicable. Identify the governing project specification and standard edition; flag unknowns rather than guessing.
- Identification files
- Attach the available datasheet, drawing and revision. For replacement parts, add the parent equipment model, serial number, part number, nameplate photos and measured dimensions with units.
- Required quotation documents
- Ask for the offered datasheet, scope of supply, drawing references and a deviation list. Name any required material records, inspection or test reports and certification scope; ask the bidder to confirm availability, cost and submission stage.
- Destination, date and packing
- State the destination country and delivery point, required-on-site date, and proposed delivery term with its named place. Request package dimensions, weights, preservation details and packing cost; distinguish dispatch from arrival.
- Commercial response basis
- Specify the quotation deadline and currency, plus a target price if relevant. Request itemized prices, quotation validity, payment and warranty terms, freight inclusions and a separate list of exclusions.