Surface Production & Well Testing
Two- and Three-Phase Well Test Separators
Two- and Three-Phase Well Test Separators for separation and individual measurement of gas, oil, water and limited solids during cleanup, flowback and production testing, with RFQ fields covering minimum, normal and maximum wellstream rates, phase fractions, pressure and temperature, fluid properties, gas-oil ratio, water cut, sand and foam, retention time, two- or three-phase duty, vessel orientation, pressure rating, sour service, metering, controls, relief system and skid transport limits.
RFQ selection reference
Reference fields for quotation comparison. Final values must be confirmed in the signed manufacturer datasheet.
| Selection field | Typical input | Typical input | Typical input | Buyer note |
|---|---|---|---|---|
| Process cases | Design and operating pressure/temperature | Gas, oil, water and solids rates | — | Provide minimum, normal, maximum and upset cases |
| Separation duty | Two- or three-phase performance basis | — | Retention, internals and sand handling | State foam, emulsion and carryover limits |
| Package and code | — | Horizontal or vertical skid arrangement | Meters, controls, relief and ESD | Define vessel code, sour service and inspection scope |
Product scope
Two- and Three-Phase Well Test Separators are presented as a quotation-ready product family for separation and individual measurement of gas, oil, water and limited solids during cleanup, flowback and production testing. This page supports early technical comparison; it does not identify one guaranteed model, stocked unit or universal configuration. The final supplier and manufacturer must confirm the ordered design against the buyer's datasheet, project specification, applicable code editions and signed quotation.
Selection basis
The main selection inputs are minimum, normal and maximum wellstream rates, phase fractions, pressure and temperature, fluid properties, gas-oil ratio, water cut, sand and foam, retention time, two- or three-phase duty, vessel orientation, pressure rating, sour service, metering, controls, relief system and skid transport limits. These fields affect equipment fit, performance, safety, documentation, transport and total package price. For replacement equipment, include the installed maker, model, serial number, original part number, clear nameplate photographs and interface drawings. For a new package, attach process cases, site data, governing specifications and the latest approved standard editions.
Configuration reference
The table above is a structured RFQ reference rather than a manufacturer model list. It shows the information required to compare technically responsive quotations. Public standards and manufacturer examples identify common architecture and purchasing fields only; they do not imply dealership, authorization, stock ownership or identical performance across suppliers.
Documents and inspection
Define the document package before commercial evaluation. Depending on the equipment, request signed datasheets, process and instrumentation diagrams, general arrangement and interface drawings, design calculations, material certificates, pressure or performance test reports, NDT records, hazardous-area certificates, inspection and test plan, preservation procedure, packing list, lifting plan, marking photographs and certificate of conformity. Verify the exact code edition, certificate scope, manufacturing facility and offered model before purchase-order release.
RFQ checklist
- •Product family, service, quantity and required delivery date
- •Operating cases, pressure or load, temperature, flow and process media
- •Dimensions, connections, materials and approved standard edition
- •Site utilities, ambient conditions and hazardous-area classification
- •Required testing, third-party inspection, traceability and document language
- •Destination, Incoterm, packing, lifting and transport restrictions
- •Target unit price or budget range and acceptable technical alternatives
Upload the specification, drawing, equipment list, process data or replacement photographs with the inquiry. Open technical points and supplier deviations should be closed before price comparison and order release.
Technical reference trail
These public references support the equipment family and selection context. They do not imply dealership, authorization or a guaranteed order specification.
Frequently Asked Questions
What information is required to quote Two- and Three-Phase Well Test Separators?
Provide minimum, normal and maximum wellstream rates, phase fractions, pressure and temperature, fluid properties, gas-oil ratio, water cut, sand and foam, retention time, two- or three-phase duty, vessel orientation, pressure rating, sour service, metering, controls, relief system and skid transport limits, quantity, destination, delivery target and the required document package. Attach the project datasheet, process data or matching equipment drawing whenever available.
Are the displayed specifications guaranteed values?
No. They are RFQ reference fields. The final manufacturer datasheet, approved drawings, calculations, test procedure and purchase specification control the ordered equipment.
Can an equivalent configuration be quoted?
Yes, when the buyer permits alternatives. Every deviation in standard, rating, material, interface, certification, testing or delivery scope should be listed clearly for technical review.
Technical and RFQ References
Check common units, standards and purchasing terminology, then build a structured request for this equipment.
Submit RFQ for Two- and Three-Phase Well Test Separators
Send product, quantity, specification and destination details so the requirements can be reviewed with potential suppliers.
Related Products

Wellhead Sand Separators and Desanders
Wellhead Sand Separators and Desanders for removal and controlled collection of produced sand and solids upstream of test or production equipment during flowback and cleanup, with RFQ fields covering gas and liquid rate, pressure, temperature, sand loading and particle distribution, erosion velocity, vessel or cyclonic design, dump frequency, solids collection volume, liner material, choke integration, relief, instrumentation, sour service and disposal method.

Surge Tanks and Atmospheric Gauge Tanks
Surge Tanks and Atmospheric Gauge Tanks for liquid buffering, gas breakout, volume gauging and controlled transfer downstream of well-test separation equipment, with RFQ fields covering pressurized surge or atmospheric duty, operating pressure and temperature, liquid rate, surge volume, residence time, fluid properties, gas breakout, level measurement, vent and relief routing, transfer pumps, sampling, sour service, hazardous area and transport format.

Well Test Heaters and Heat Exchangers
Well Test Heaters and Heat Exchangers for wellstream heating or cooling to manage hydrate, wax, viscosity, separation and disposal conditions during surface testing, with RFQ fields covering wellstream composition and rates, inlet and outlet temperature, pressure, heat duty, utility medium, fouling and solids, pressure drop, metallurgy, exchanger type, burner or steam requirements, control philosophy, relief, hazardous area, sour service and skid limits.

Surface Test Manifolds and ESD Systems
Surface Test Manifolds and ESD Systems for routing, isolation, pressure control and emergency shutdown between the wellhead, separator, metering and disposal equipment, with RFQ fields covering inlet and outlet pressure classes, line sizes, flow paths, adjustable and fixed chokes, valve type and actuation, sour and erosive service, temperature, piping class, relief and bleed-down, shutdown valves, sensors, logic, fail positions, interfaces and skid lifting limits.
Related Technical Articles
API 6A Wellhead Equipment Supplier RFQ Guide
What to specify before asking suppliers for API 6A wellhead equipment quotations. Includes RFQ fields, supplier checks, and internal links for oilfield buyers.
BOP Spare Parts Supplier RFQ Guide
A quote checklist for annular BOP and ram BOP replacement parts. Includes RFQ fields, supplier checks, and internal links for oilfield buyers.
Choke Manifold Supplier RFQ Guide
How to prepare a choke manifold RFQ that suppliers can quote accurately. Includes RFQ fields, supplier checks, and internal links for oilfield buyers.