Surface Production & Well Testing
Multiphase Flow Metering Skids
Multiphase Flow Metering Skids for real-time measurement of combined oil, gas and water rates without full phase separation for well testing and production surveillance, with RFQ fields covering line size, pressure and temperature, total flow envelope, gas volume fraction, water cut, fluid density and PVT data, salinity, viscosity, sand, flow regime, turndown, target uncertainty, meter technology, calibration, sampling, communications, hazardous area and data integration.
RFQ selection reference
Reference fields for quotation comparison. Final values must be confirmed in the signed manufacturer datasheet.
| Selection field | Typical input | Typical input | Typical input | Buyer note |
|---|---|---|---|---|
| Flow envelope | Minimum and maximum total rate | GVF, water cut and phase properties | — | Provide PVT and expected flow-regime data |
| Meter performance | Required phase uncertainty and turndown | — | Technology and calibration method | Define reference and acceptance test conditions |
| Skid integration | — | Line size, pressure class and bypass | Power, communications and hazardous area | Attach control-system and data-tag requirements |
Product scope
Multiphase Flow Metering Skids are presented as a quotation-ready product family for real-time measurement of combined oil, gas and water rates without full phase separation for well testing and production surveillance. This page supports early technical comparison; it does not identify one guaranteed model, stocked unit or universal configuration. The final supplier and manufacturer must confirm the ordered design against the buyer's datasheet, project specification, applicable code editions and signed quotation.
Selection basis
The main selection inputs are line size, pressure and temperature, total flow envelope, gas volume fraction, water cut, fluid density and PVT data, salinity, viscosity, sand, flow regime, turndown, target uncertainty, meter technology, calibration, sampling, communications, hazardous area and data integration. These fields affect equipment fit, performance, safety, documentation, transport and total package price. For replacement equipment, include the installed maker, model, serial number, original part number, clear nameplate photographs and interface drawings. For a new package, attach process cases, site data, governing specifications and the latest approved standard editions.
Configuration reference
The table above is a structured RFQ reference rather than a manufacturer model list. It shows the information required to compare technically responsive quotations. Public standards and manufacturer examples identify common architecture and purchasing fields only; they do not imply dealership, authorization, stock ownership or identical performance across suppliers.
Documents and inspection
Define the document package before commercial evaluation. Depending on the equipment, request signed datasheets, process and instrumentation diagrams, general arrangement and interface drawings, design calculations, material certificates, pressure or performance test reports, NDT records, hazardous-area certificates, inspection and test plan, preservation procedure, packing list, lifting plan, marking photographs and certificate of conformity. Verify the exact code edition, certificate scope, manufacturing facility and offered model before purchase-order release.
RFQ checklist
- •Product family, service, quantity and required delivery date
- •Operating cases, pressure or load, temperature, flow and process media
- •Dimensions, connections, materials and approved standard edition
- •Site utilities, ambient conditions and hazardous-area classification
- •Required testing, third-party inspection, traceability and document language
- •Destination, Incoterm, packing, lifting and transport restrictions
- •Target unit price or budget range and acceptable technical alternatives
Upload the specification, drawing, equipment list, process data or replacement photographs with the inquiry. Open technical points and supplier deviations should be closed before price comparison and order release.
Technical reference trail
These public references support the equipment family and selection context. They do not imply dealership, authorization or a guaranteed order specification.
Frequently Asked Questions
What information is required to quote Multiphase Flow Metering Skids?
Provide line size, pressure and temperature, total flow envelope, gas volume fraction, water cut, fluid density and PVT data, salinity, viscosity, sand, flow regime, turndown, target uncertainty, meter technology, calibration, sampling, communications, hazardous area and data integration, quantity, destination, delivery target and the required document package. Attach the project datasheet, process data or matching equipment drawing whenever available.
Are the displayed specifications guaranteed values?
No. They are RFQ reference fields. The final manufacturer datasheet, approved drawings, calculations, test procedure and purchase specification control the ordered equipment.
Can an equivalent configuration be quoted?
Yes, when the buyer permits alternatives. Every deviation in standard, rating, material, interface, certification, testing or delivery scope should be listed clearly for technical review.
Technical and RFQ References
Check common units, standards and purchasing terminology, then build a structured request for this equipment.
Submit RFQ for Multiphase Flow Metering Skids
Send product, quantity, specification and destination details so the requirements can be reviewed with potential suppliers.
Related Products

Two- and Three-Phase Well Test Separators
Two- and Three-Phase Well Test Separators for separation and individual measurement of gas, oil, water and limited solids during cleanup, flowback and production testing, with RFQ fields covering minimum, normal and maximum wellstream rates, phase fractions, pressure and temperature, fluid properties, gas-oil ratio, water cut, sand and foam, retention time, two- or three-phase duty, vessel orientation, pressure rating, sour service, metering, controls, relief system and skid transport limits.

Wellhead Sand Separators and Desanders
Wellhead Sand Separators and Desanders for removal and controlled collection of produced sand and solids upstream of test or production equipment during flowback and cleanup, with RFQ fields covering gas and liquid rate, pressure, temperature, sand loading and particle distribution, erosion velocity, vessel or cyclonic design, dump frequency, solids collection volume, liner material, choke integration, relief, instrumentation, sour service and disposal method.

Surge Tanks and Atmospheric Gauge Tanks
Surge Tanks and Atmospheric Gauge Tanks for liquid buffering, gas breakout, volume gauging and controlled transfer downstream of well-test separation equipment, with RFQ fields covering pressurized surge or atmospheric duty, operating pressure and temperature, liquid rate, surge volume, residence time, fluid properties, gas breakout, level measurement, vent and relief routing, transfer pumps, sampling, sour service, hazardous area and transport format.

Well Test Heaters and Heat Exchangers
Well Test Heaters and Heat Exchangers for wellstream heating or cooling to manage hydrate, wax, viscosity, separation and disposal conditions during surface testing, with RFQ fields covering wellstream composition and rates, inlet and outlet temperature, pressure, heat duty, utility medium, fouling and solids, pressure drop, metallurgy, exchanger type, burner or steam requirements, control philosophy, relief, hazardous area, sour service and skid limits.
Related Technical Articles
API 6A Wellhead Equipment Supplier RFQ Guide
What to specify before asking suppliers for API 6A wellhead equipment quotations. Includes RFQ fields, supplier checks, and internal links for oilfield buyers.
BOP Spare Parts Supplier RFQ Guide
A quote checklist for annular BOP and ram BOP replacement parts. Includes RFQ fields, supplier checks, and internal links for oilfield buyers.
Choke Manifold Supplier RFQ Guide
How to prepare a choke manifold RFQ that suppliers can quote accurately. Includes RFQ fields, supplier checks, and internal links for oilfield buyers.